I had aimed by now to have completed the texturing of the first scene but I had been unable to do anything since 13th February. My family have gone over to do a pilgrimage and so I have to be at home to care for my father. I did not feel too stressed at this point though as I felt I had completed a good amount and feel I am on track.
Due to the demands at home, I will most probably be unable to work on my project until the 29th Feb. This may mean I have to try to work faster or perhaps cut down my scene a little in order to get the same message across.
I have begun UV Mapping some of my assets which are in individual files. For the most part, my assets have been combined into one scene and built inside the whole scene as it was easier to position assets and model according to consistency in looks. My computer at home crashes every time I attempt to open my scene and so I guess I will return to work on my project when I am able to come back to university.
In the mean while, I will think about the types of shots I want to include in my film, working off the pre-production material.
No comments:
Post a Comment